Project Updates
Showing 29,841-29,860 of 32,365 items.
#Project CodeProject NameDepartmentDistrictPhaseProgress StatusApprove Date
     
29841WP-SE(S)-16-TBL-LPSConstruction of 3(three) Classrooms at Langmeithek Primary School, Thoubal District, ManipurEducation (S)ThoubalNilFront view
29842Imphal Sewrage Project, Phase-I Imphal Sewerage Project phase-I for Imphal Town with French AssistancePHEDImphal-West1On going
29843WP-HE/14-DMC/TE-LDLand Development works in front of D.M. College of Teacher Education and D.M. College of Commerce.Education (S)Imphal-WestNilFinishing
29844MEV-18-NAugmentation of Water Supply Schemes for Thoubal (Waithoupat)PHEDThoubalPhase-1Ongoing
29845MSPCLC22Installation of 2x5 MVA, 33/11 kV Sub-Station along with associated 33 kV LILO line & related works at Khongjom.POWER (MSPCL)ThoubalCompleted100% complete
29846BD-II/AE-I/2016-17/2Renovation of MPSC office, ManipurPWDImphal-EastNil90%
29847WP-08/09-HE-ScLab-IC-SHINGConstruction of Science Lab. at Imphal College, Imphal. (SH: Shingling along the approach of Library Block)Education (S)Imphal-WestNilCompleted
29848MSPCLB6INSTALLATION OF 2x20 MVA, 132/33 kV S/S ALONG WITH ASSOCIATED 132 kV LILO LINE AND RELATED CIVIL WORKS AT ELANGKHANGPOKPI IN MANIPURPOWER (MSPCL)KakchingX100%
29849NEC-II/BPR-NUNGBA/1Improvement of Bishnupur Nungba Road 0-89.52 KmsPWDOthers1In progress
29850WSM-II-CHINGKHEICHINGConstruction of Water Treatment Plant at Chingkheiching (45.00 MLD Capacity) for Imphal CityPHEDImphal-EastOneWork in progress
29851BPR/Constn. of 6m Span culvert/12Constn. of 6m Span culvert at Laisoi-Hiran on the Bishnupur Mayang Imphal at Toubul Mamang.PWDBishnupur2ndCompleted
29852BPR/Constn. of 6m Span culvert/12Constn. of 6m Span culvert at Laisoi-Hiran on the Bishnupur Mayang Imphal at Toubul Mamang.PWDBishnupur2ndCompleted
29853MSPCLC5Installation of 2x5 MVA, 33/11 kV Sub-Station with associated 33 kV line at Nungbi KhullenPOWER (MSPCL)UkhrulX100
29854IED/Luwangsangbam Mamang/74Impvt. of road from Luwangsangbam Mamang Leikai (Haotabi to Liberal College gate).PWDImphal-East1On going
29855IED/Godown Gate Luwangsangbam/73Impvt. of road from Godown Gate (NH-2) Luwangsangbam Maning Leikai.PWDImphal-East1On going
29856IED/Drain- Koirengei-Maria Montessori Gate/78Constn. of pucca line drain from Koirengei Bazar to Maria Montessori GatePWDImphal-East1On going
29857IED/RCC culvert Lairikyengbam//92Contn. of 2m span RCC clab culvert and line pucca drain at Lairikyengbam Makha Leikai Salan leirak and Maning Chuthek LeikaiPWDImphal-East1On going
29858CCP/Thingkeu Henglep/3Improvement of Thinkeu-Henglep roadPWDChurachandpur2016-17Complete
29859IED/Sangakpham Bazar-Paomei Colony/69Constn. of RCC slab culvert and pucca line drain from Sangakpham Bazar to Paomei Colony Heingang RoadPWDImphal-East1On going
29860IED/RCC culvert-Kontha Ahallup/84Constn. of 1 m span RCC slab culvert at Kontha Ahallup.PWDImphal-East1On going